Get One of the Top 50 Plumbing Blogs Directly to Your Inbox!

Posted by on

Top Gun Manhole to Manhole Lining SystemIf you are a large contracting company and you are bidding on a municipal, county or state pipe lining project, you may be looking to subcontract that work out to a smaller company. However, you need to be certain that the company to which you contract out these important projects to has the tools and the experience to get the job done right the first time and turn your contract around in a flash. At Express Sewer & Drain, that’s exactly what we do.

Over the last several blog posts, we’ve been spotlighting some of the heavy equipment we own that helps large plumbing contractors complete those big public projects with ease. We discussed our:

  • CUES vans
  • Bowman Cutters
  • Vac-Con Equipment
  • And other assets

We also mentioned that we exclusively use Perma-Liner Top Gun Manhole-To-Manhole pipe lining system. Top Gun is another one of our state-of-the-art products that we can offer Sacramento CIPP contractors to ensure that your next big city or county project flows as effortlessly as water through a newly laid line.

How Top Gun Works    

As a CIPP contractor, we don’t have to explain to you the benefits of trenchless technology. But if you work for a city or county’s sewer and water department, we can tell you that cured-in-place pipe (CIPP) is THE way to go when repairing faulty sewer, water or gas lines, no matter the scale of the job. You don’t have to dig. You don’t have to worry about interrupting commerce. You’ll be doing the environment a favor and you’ll be implementing a sustainable plumbing system guaranteed to last over 50 years!

CIPP contractor in Sacramento? Look At Our Perma-Liner Top Gun System

Top Gun is a continuous lining system that has been implemented worldwide because of its economic efficiency, flexibility and the durability you’ve come to expect from all Perma-Liner products. Municipal sewer lines vary greatly in length. Varying pipeline lengths can make municipal sewer repair challenging. With older excavation methods, the cost alone for erosion control, soil stabilization and permitting requirements is exorbitant. Not so with continuous lining.

Continuous lining features all the advantages of other trenchless technologies:

  • Environmentally sound
  • Cost effective
  • Maximum durability
  • Minimal traffic disruption
  • No collateral damage

Main-Line CIPP Systems We Use:

Perma-Main Top Gun F-10 Model

Application: Manhole to Manhole Lining (Main Lining)

  • Continuous Air Inversion
  • 600+ Feet Continuous
  • Approximately 1-foot of liner inverted per 1.5 seconds
  • Rapid Steam Cure (w/ Viper)
  • Pre-Wet Out Liner / No Wet Facility Required
  • Diameter Pipe: 6” – 10” (important)

Perma-Main Top Gun F-18 Model

Application: Manhole to Manhole Lining (Main Lining)
Same as above except:

  • Diameter Pipe: 12” – 18” (important)

Perma-Main Top Gun F-24 Model

Application: Manhole to Manhole Lining (Main Lining)

  • Continuous Air Inversion
  • 600+ Feet Continuous
  • Approximately 1-foot of liner inverted per 1.5 seconds
  • Rapid Steam Cure (w/ Viper)
  • Pre-Wet Out Liner / No Wet Facility Required
  • Diameter Pipe: 18” – 24” (important)

This gives Sacramento CIPP contractors every advantage they need for a variety of job sites.

Contact Express For A Free Evaluation

You want to keep those large contracts coming in, right? Express is your subcontractor to turn to for cutting edge equipment and the best-trained staff around.

 

Get A Quick Quote

Topics: Plumbing in Sacramento, Trenchless Technology